Implementation of Bozhou Haichuang 2×6M m2 Fiber Cement Board Production Line Project is now going on smoothly. Blending station is mostly completed. 600m。2000 m rails have been finished. Installation of main part of the boiler room has been ready. Embody of cables has been finishe
2014-06-06Tianjin Fangxin Energy Conservation Tech. Co., Ltd 2*150000 m3 exterior wall board production line and relating project now comes into installation period. Implementation of this project goes smoothly from the day the contract was signed til now. Currently, tempory building and power connection o
2014-06-04Sinkiang Beixin New Building Material Co., Ltd 5 M m2/y fiber cement board production line project is located to the north of Urumchi. Presently, commossioning of this project has been started. Trial production has also been started.
2014-06-03On June 7, guests from NAKORN Group of Thailand came to visit SINOMA-Wuhan. NAKORN got a great interest of SINOMA-Wuhan's technology on fiber cement board production line.
2014-06-02Recently, SINOMA-Wuhan signed the 2nd fiber cemnet board production line with the Owner of Saudi Arabia project on the basis of EP project. SINOMA-Wuhan will design and build the 2nd Hatscheck fiber cement board production line. Currently, equipment of the 1st line have been delive
2014-05-30Since SINOMA-Wuhan signed the 1st 5 M m2/y fiber cement board production line with Baishan DOngbeiya Building Material Co., Ltd in 2012,the two companies signed the 2nd line with the same capacity recently.
2014-05-20